
黄金与关键矿产勘探开采公司德干黄金矿业有限公司(Deccan Gold Mines Ltd)周日表示,其位于恰蒂斯加尔邦的 Bhalukona 项目已报告镍-铜-铂族元素矿化潜在资源量超过 400 万吨,初步地质建模显示估算品位约为 0.24% 镍当量。
Gold and critical minerals exploration and mining firm Deccan Gold MinesLtd on Sunday said it has reported the potential for over 4 million tonnes of nickel-copper-platinum group elements mineralisation at its Bhalukona project in Chhattisgarh, with preliminary geological modelling indicating an estimated grade of around 0.24% nickel equivalent.
初步估算基于勘探钻探数据,仅涵盖项目已识别的 1.3 公里矿化走廊中约 300 至 350 米范围内的近地表矿化。目前的模型覆盖已识别走廊的约 25%,并未纳入无人机磁法和激发极化勘探所指示的矿化序列潜在重复带。
The preliminary estimates are based on exploration drilling data and cover only near-surface mineralisation across approximately 300-350 metres of the 1.3-km mineralised corridor identified at the project. The current model accounts for around 25% of the identified corridor and excludes potential repetitions of the mineralised sequence indicated by drone magnetic and induced polarisation surveys.
公司表示,这些发现为矿床的规模和地质特征提供了初步认识。估算的镍当量品位是根据镍、铜、铂和钯矿化的加权贡献计算得出。德干黄金押注关键矿产,意在控股西班牙钨项目Bhalukona 项目:勘探详情德干黄金于 2025 年 4 月 1 日从恰蒂斯加尔邦政府获得 Bhalukona-Jamnidih 复合许可证,成为印度最早获得镍勘探许可证的公司之一。
The company said the findings provide a preliminary understanding of the scale and geological characteristics of the deposit. The estimated nickel-equivalent grade is calculated based on the weighted contribution of nickel, copper, platinum and palladium mineralisation. Deccan Gold bets on critical minerals, targets controlling stake in Spanish tungsten projectBhalukona Project: Exploration DetailsDeccan Gold received the Bhalukona-Jamnidih Composite Licence from the Chhattisgarh government on April 1, 2025, becoming one of the early companies to receive a nickel exploration licence in India.
该项目占地约 30 平方公里,位于恰蒂斯加尔邦马哈萨芒德县巴萨纳泰希尔。
The project covers approximately 30 square kilometres in Basana Tehsil, Mahasamund district of Chhattisgarh.
该公司在过去19个月里实施了分阶段勘探计划,包括无人机磁力测量和光探测与测距(LiDAR)测量、深部激发极化(IP)测量、电阻率层析成像、地质测绘、岩屑和槽道采样,以及为选矿研究进行的大样采样。自2026年3月以来,Deccan Gold还实施了金刚石钻芯钻探,共15个钻孔,总长度2773米。
The company has undertaken a phased exploration programme over the past 19 months, including drone magnetic and Light Detection and Ranging surveys, deep IP surveys, electrical resistivity tomography, geological mapping, rock-chip and channel sampling, and bulk sampling for beneficiation studies. Since March 2026, Deccan Gold has also conducted diamond-core drilling comprising 15 drill holes with a total length of 2,773 metres.
Deccan Gold董事总经理称:若审批加快,印度长期可生产逾100吨黄金勘探计划已识别出一处层状基性-超基性地质构造,蕴藏镍-铜-铂族元素(PGE)硫化物矿化。钻探确定了一条宽度超过100米、长度约1.3公里、深度超200米的矿化带。
India can produce over 100 tonnes of gold in long term if approvals speed up: Deccan Gold MDThe exploration programme has identified a layered mafic-ultramafic geological formation hosting nickel-copper-PGE sulphide mineralisation. Drilling has established a mineralised corridor more than 100 metres wide, extending approximately 1.3 km in length and to depths exceeding 200 metres.
矿化类型包括散布状以及重至致密硫化物产出。鉴定出的主要硫化物矿物为磁黄铁矿、五方黄铁矿和黄铜矿,伴有镍和铜矿化,以及钯和局部铂的产出。计划进一步勘探初步地质解释将指导下一阶段勘探,公司将继续评估地质数据,以判断矿化系统的范围和连续性。
The mineralisation includes disseminated as well as heavy-to-massive sulphide occurrences. The principal sulphide minerals identified are pyrrhotite, pentlandite and chalcopyrite, associated with nickel and copper mineralisation, along with palladium and localised platinum occurrences. Further Exploration PlannedThe preliminary geological interpretation will guide the next phase of exploration, with the company continuing to evaluate the geological data to assess the extent and continuity of the mineralised system.
目前的模型未包含地球物理测量所指示的矿化序列潜在重复带,留有进一步勘探和评估的区域。
The current model does not include potential repetitions of the mineralised sequence indicated by geophysical surveys, leaving further areas for exploration and assessment.
Deccan Gold Mines供股:请在此查看金额、配股权益、股权登记日及其他详情Deccan Gold表示,上述数字代表初步勘探阶段的解释,不构成已界定的矿产资源或矿产储量。
Deccan Gold Mines Rights Issue: Check amount, entitlement, record date, other details hereDeccan Gold said the figures represent preliminary exploration-stage interpretations and do not constitute a defined mineral resource or mineral reserve.
还需要进一步勘探、地质评估和技术评价,以确定矿化的规模、连续性和经济潜力。Deccan Gold Mines Ltd董事总经理Hanuma Prasad Modali博士表示:“印度的关键矿产雄心最终不仅取决于我们已知拥有的资源,更取决于我们发现、评估并负责任地开发这些资源的能力。Bhalukona是我们释放印度国内关键矿产潜力努力中的一个令人鼓舞的里程碑。初步建模指向一个有前景的镍-铜-PGE(铂族元素)系统,目前的估算仅覆盖已识别矿化走廊的一小部分。印度的资源安全将取决于我们在国内发现并负责任地开发战略矿产资源的能力。我们的重点是通过科学主导的勘探、技术严谨性和长期承诺来推进Bhalukona项目,为建设更强大的国内采矿生态系统和更具韧性的关键矿产供应链做出贡献。”
Further exploration, geological evaluation and technical assessment will be required to establish the scale, continuity and economic potential of the mineralisation. Dr Hanuma Prasad Modali, Managing Director, Deccan Gold Mines Ltd, said, "India's critical-minerals ambitions will ultimately be determined not just by the resources we know we possess, but by our ability to discover, evaluate and responsibly develop them. Bhalukona is an encouraging milestone in our effort to unlock India's domestic critical-mineral potential. The preliminary modelling points to a promising nickel-copper-PGE system, with the current estimates covering only a fraction of the identified mineralised corridor.
Deccan Gold股价因资产收购热潮触及15年高点;公司对出售自身股份持开放态度Deccan Gold Mines Ltd股价在BSE(孟买证券交易所)收于160.25卢比,下跌8.40卢比,跌幅4.98%。
India's resource security will depend on our ability to discover and responsibly develop strategic mineral resources at home. Our focus is to advance Bhalukona through science-led exploration, technical rigour, and long-term commitment, contributing to a stronger domestic mining ecosystem and more resilient critical-mineral supply chains." Deccan Gold shares hit 15-year high after asset-buying spree; co open to selling stake in itselfShares of Deccan Gold Mines Ltd ended at ₹160.25, down by ₹8.40, or 4.98%, on the BSE.